Tasks 01 to 22, the review, and task 23 (the review fixes, with a second,
independent review of them). The one conflict, docs/implementer-lessons.md,
had the same T18 and T19 on both sides; m3a's T20 to T22 follow them.
Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
The test client set its read timeout before every frame. On macOS that
fails with EINVAL once the handler has sent its final frame and closed,
so every admin test that reads a second frame failed there (40 runs of
40 at 2408e2c). The frame is already buffered, so the client now takes
that one refusal as the peer having closed and reads it. The plan's copy
changes with it.
Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
The strict.rs in files/ is the merged one and walks task 02's new wire
fixtures, so task 01's gate could not pass; the first run stopped on it.
Task 01 now copies area A's version, checked to give 3 and 5 passed at
task 01's end state.
Co-Authored-By: Claude Opus 5 (1M context) <noreply@anthropic.com>
Task files, the files they copy in (byte-identical to the reference on
m3a-ref), each area's check record, and a README with the per-task
table of what each check exposed. The handoff note is done with.
Co-Authored-By: Claude Opus 5 (1M context) <noreply@anthropic.com>