kyleandClaude Opus 5.5 02d5e25046 M4a task 14: post's comment was now_ms's; fixed, and every comment read
A script that rewrote the skeleton's comments put `now_ms`'s text on `post`. Task 14's second
session saw the contradiction and deliberated until cut off. Both comments are fixed, each
todo!() comment in tasks 14 and 15 was read beside its signature, and both tasks now say to stop
and quote a comment that does not fit. Lesson T29.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
2026-09-24 00:40:05 -07:00
kyleandClaude Opus 5.5 564875f0a0 M4a tasks 14 and 15: glue written, calls tabled, after task 14's session wrote nothing
Task 14's session read the crate to learn the APIs and planned `connect` in prose until it was
cut off. `connect`, `Gateway::new` and `catch_up` are now written; the task lists every call with
its signature and makes the copy and the failing test the first actions. Task 15's comment is
rewritten one step per item. Both checked to fail, then pass when filled from their comments.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
2026-09-23 21:50:18 -07:00
kyleandClaude Opus 5.5 0339dc13b2 Plan M4a: gatewayd in 15 tasks, with skeletons and given tests
Each task's tests were run against a reference at its end state; the end states were replayed
from master in order with the gate at each step (650 to 762 tests); each skeleton compiles
against its tests and fails them. The reference is kept off this machine. Lessons T27 (every
wait in a test has a limit) and T28 (mutate the reference before hand-over) come from this work.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>