Task 08's `header` was one todo!() with a dozen branches; Ornith planned it in its head until the
turn ran out (tip T25). `next_message` and `header` are now written as glue over seven small
helpers, and task 09's `poll` over four, each checked to pass when filled from its comments.
Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
Each task's tests were run against a reference at its end state; the end states were replayed
from master in order with the gate at each step (650 to 762 tests); each skeleton compiles
against its tests and fails them. The reference is kept off this machine. Lessons T27 (every
wait in a test has a limit) and T28 (mutate the reference before hand-over) come from this work.