v1 plan: task 06 must update the one admin.Handler call in main.go for the gate; note the finding

Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
This commit is contained in:
2026-09-25 06:29:09 -07:00
co-authored by Claude Fable 5.1
parent 4da47b3dfa
commit c2136b3515
2 changed files with 10 additions and 4 deletions
+4
View File
@@ -115,3 +115,7 @@ tools/run-plan.sh docs/plans/v1 # from a clean checkout on master
Split into `06-admin.md` (handler only; inherits the store/lease additions from the tree) and
`07-main.md` (wiring); the smoke task became 08. Session stopped by the owner; the broken
`admin.go` draft was left in the tree for the next session to replace.
- 2026-09-25, task 06 (admin), during the run: the task text said the wiring in `cmd/crossbar`
"does not fail the gate", but `go vet ./...` compiles `main.go`, whose two-argument
`admin.Handler` call no longer matches — the gate does fail. Ornith noticed while reading.
Task fault (mine): step 5 now allows the one-call edit to `main.go`.