Tracks implementation status. See PROJECT_PLAN.md for the full plan and ARCHITECTURE.md for design details.
If you are picking this up mid-implementation, read this file first.
Current Status
Phase: Steps 1–6 complete. Ready for Step 7 (Remaining Commands).
Last updated: 2026-03-23
Completed Steps
- Step 1: Project Scaffolding — removed old C++ files and
.trunk/config, initialized Go module, added cobra + yaml.v3 deps, created package dirs, set up cobra root command with--repoflag. - Step 2: Manifest Package —
ManifestandEntrystructs with YAML tags,New(),Load(path), andSave(path)with atomic write. 5 tests. - Step 3: Store Package — content-addressable blob store with SHA-256 keying.
New(),Write(),Read(),Exists(),Delete()with atomic writes, hash validation, and two-level directory layout. 11 tests. - Step 4: Garden Core — Init and Add —
Gardenstruct tying manifest + store,Init(),Open(),Add()handling files/dirs/symlinks,HashFile(), tilde path conversion, CLIinitandaddcommands. 8 tests. - Step 5: Checkpoint and Status —
Checkpoint()re-hashes all tracked files, stores changed blobs, updates timestamps.Status()reports ok/modified/missing per entry. CLIcheckpoint(with-mflag) andstatuscommands. 4 tests. - Step 6: Restore —
Restore()with selective paths, force mode, confirm callback, timestamp-based auto-restore, parent dir creation, symlink support, file permission restoration. CLIrestorewith--forceflag. 6 tests.
In Progress
(none)
Up Next
Step 7: Remaining Commands (remove, verify, list, diff).
Known Issues / Decisions Deferred
- Blob durability: blobs are not stored in git. A strategy for backup or replication is deferred to a future phase.
- gRPC remote mode: Phase 2. Package structure is designed to accommodate it (garden core separates logic from CLI wiring).
- Clock abstraction: Inject a clock interface (e.g.
jonboulle/clockwork) into Garden instead of callingtime.Now()directly. Improves timestamp test determinism. Deferred to Step 8 (Polish).
Change Log
| Date | Step | Summary |
|---|---|---|
| 2026-03-23 | — | Design phase complete. ARCHITECTURE.md and PROJECT_PLAN.md written. |
| 2026-03-23 | 1 | Scaffolding complete. Old C++ removed, Go module initialized, cobra root command. |
| 2026-03-23 | 2 | Manifest package complete. Structs, Load/Save with atomic write, full test suite. |
| 2026-03-23 | 3 | Store package complete. Content-addressable blob store, 11 tests. |
| 2026-03-23 | 4 | Garden core complete. Init, Open, Add with file/dir/symlink support, CLI commands. 8 tests. |
| 2026-03-23 | 5 | Checkpoint and Status complete. Re-hash, store changed blobs, status reporting. 4 tests. |
| 2026-03-23 | 6 | Restore complete. Selective paths, force/confirm, timestamp logic, symlinks, permissions. 6 tests. |