ARCHITECTURE.md: tech stack (Go, YAML, cobra), repo layout, manifest schema, content-addressable blob store, CLI commands, package structure. PROJECT_PLAN.md: 8-step implementation sequence with parallelism notes. PROGRESS.md: status tracker for resumable implementation. CLAUDE.md: project guidance for Claude Code, references design docs. Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
39 lines
963 B
Markdown
39 lines
963 B
Markdown
# PROGRESS.md
|
|
|
|
Tracks implementation status. See PROJECT_PLAN.md for the full plan and
|
|
ARCHITECTURE.md for design details.
|
|
|
|
**If you are picking this up mid-implementation, read this file first.**
|
|
|
|
## Current Status
|
|
|
|
**Phase:** Pre-implementation — design complete, ready to begin Step 1.
|
|
|
|
**Last updated:** 2026-03-23
|
|
|
|
## Completed Steps
|
|
|
|
(none yet)
|
|
|
|
## In Progress
|
|
|
|
(none yet)
|
|
|
|
## Up Next
|
|
|
|
Step 1: Project Scaffolding — remove old C++ files, initialize Go module,
|
|
create directory structure, set up cobra root command.
|
|
|
|
## Known Issues / Decisions Deferred
|
|
|
|
- **Blob durability**: blobs are not stored in git. A strategy for backup or
|
|
replication is deferred to a future phase.
|
|
- **gRPC remote mode**: Phase 2. Package structure is designed to accommodate
|
|
it (garden core separates logic from CLI wiring).
|
|
|
|
## Change Log
|
|
|
|
| Date | Step | Summary |
|
|
|---|---|---|
|
|
| 2026-03-23 | — | Design phase complete. ARCHITECTURE.md and PROJECT_PLAN.md written. |
|